11
Jan
Resman fill first order for clean up monitoring with Tyrihans
RESMAN’s technology can prove a cost effective way of monitoring the clean-up of the long, horizontal Tyrihans wells and it is expected that the results obtained can be used for optimizing future wells on the field. Production from Tyrihans is scheduled to commence in 2009 and is expected to reach an initial plateau of around 70 000 barrels of oil equivalent in 2011 from the subsea development tied back to the nearby Kristin field. The current drilling schedule includes up to 11 wells.
